1,200 new units over 80 acres

Within the overall site layout, we have ensured that there is a buffer zone of green open space between the A19 and the residential units.

This will act as an acoustic shield for the residents as well as incorporating swales as part of the Sustainable Urban Drainage Strategy (SuDS) of the site.